Top of the pageSkip to main content

Extra-Long Lead Rope

Black extra-long lead rope (2.9 m) featuring an extra-strong stainless steel hook and an MD emblem. Made from a soft, braided material. Comes with a protective dust bag.
  • Free shipping with minimum purchase €150, £200, $200

  • 30 days right of withdrawal